Case Studies

Solution Engineering 1 - Domestics Optimization

Reducing Domestic Logistics Cost by Overlooking Customer’s Flow

Before

830 Miles

After

600 Miles

Before

830 Miles

Before

Discharge at Long Beach Port

  • A

    Chicago Rail Ramp

  • B

    Inspection & Re-packaging at Indianapolis Factory

  • C

    Delivery to customer in Toronto, Canada

After

600 Miles

After

Discharge at Long Beach Port

  • A

    Chicago Rail Ramp

  • B

    Inspection & Re-packaging at Suzuyo Warehouse in Chicago

  • C

    Delivery to customer in Toronto, Canada

Logistics Improvement

Relocating Inspection & Re-packaging to shorten the total logistics flow

Cost Reduction*

Shorten 230 Miles/Trailer = 25.7% Cost reduction

*Customer can enjoy cost reduction further by outsourcing inspection & re=packaging

Solution Engineering 2 - Domestics Optimization

Optimization of total logistics flow utilizing Suzuyo warehouses in Asia and USA

Before
After

Improvement

Consolidation of multiple shipments by single window
Reduction of damage, direct & indirect cost and transit time